![]() ![]() In addition to the asphaltic overlay, drainage improvements will be performed along the length of the project. There will be a pause in construction until paving operations can begin in early Summer 2023.ĭescription of work: The existing asphalt roadway will be recycled in place with a new asphalt driving surface placed after recycling the existing pavement. Location/limits: WIS 96 in Brown County from WIS 32 in the town Wrightstown to I-43 in the town of New Denmark Access at WIS 29/County U to the north is now right in/ right out.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |